Banana Ripening Warehouse
We supplied LINIA Continuous lighting busbar system as an upgrade and replacement of the existing discharge lamps in this busy banana ripening warehouse. The project was completed in sections and the building remained in use throughout.
LINIA was chosen for its ability to be installed quickly and easily – paramount in this case where the building needed to remain operational the whole time. The exceptional efficiency also brought dramatic energy savings.
Products Used
LINIA Projects

Banana Ripening Warehouse
We supplied LINIA Continuous lighting busbar system as an upgrade and replacement of the existing discharge lamps

UCA Epsom
Refurbishment of the photography and printroom at the University of Creative Arts Epsom

1 FA (Finsbury Avenue) – Category B Fitout
Category B FitoutCategory B - Fitout
LINIA came into its own for the various office Cat B fitouts, including space ...

1FA (Finsbury Avenue) – Category A Fitout
Refurbishment of the iconic grade II listed building, originally constructed in the 1980’s by Arup Associates
